Hosting decisions combine technical requirements, operating costs and environmental considerations. Where relevant, reporting frameworks such as the Corporate Sustainability Reporting Directive (CSRD)may inform information needs. Their applicability must be assessed separately; choosing a host does not establish regulatory compliance.
If you have already optimised your frontend with tools such as Tailwind CSS or reduced media weight, also review the infrastructure supporting the service. Its share of the footprint depends on the workload and assessment scope.
This guide outlines questions for comparing hosting options. It is not an independent environmental ranking of providers. For the fundamentals, read our introduction to sustainable web design.
Hosting within an organisation’s footprint
The cloud relies on physical infrastructure. Rather than applying an unsupported global percentage, assess electricity use, equipment and coolingwithin a stated scope and period.
For an organisation, purchased hosting services may form part of its Scope 3 emissions inventory. Classification and calculation depend on the accounting methodology; a provider change should be evaluated using comparable evidence.
Three environmental considerations
A data centre can affect the environment through:
- Electricity : Power for servers and supporting infrastructure.
- Water use : Depending on cooling technology and local conditions.
- Equipment : Manufacturing, maintaining and replacing servers and networking hardware also have impacts.
Technical criteria for assessing hosting
Ask for specific, dated evidence rather than relying on a green label.
1. PUE: Power Usage Effectiveness
PUE is the ratio of total facility energy use to IT equipment energy use. It describes infrastructure overhead, not the carbon intensity or efficiency of the applications hosted there.
- Illustrative ratio : ~1.6
- Lower overhead : < 1.2
- Theoretical lower bound : 1.0, when all measured facility energy serves IT equipment.
2. WUE: Water Usage Effectiveness
WUE relates water use to IT energy use. Compare figures only when boundaries and reporting periods match. Local water stress and the cooling system also matter.
3. Electricity procurement: contracts and certificates
Ask what the provider’s claims mean:
- Guarantees of Origin : Certificates documenting attributes of electricity production. They do not by themselves describe hourly local electricity supply.
- Power Purchase Agreement (PPA) : A contractual electricity purchasing arrangement. Environmental implications depend on the project, contract and accounting approach.
Five hosting providers to investigate
The following providers are starting points for research. No infrastructure audit or comparative performance benchmark was conducted for this article. Request current evidence and a suitable quote.
1. Infomaniak (Switzerland)
Environmental information to review
- PUE / WUE : Request current, site-specific figures.
- Electricity : Check the provider’s current procurement disclosures.
- Potential fit : Review web and cloud hosting against your requirements.
- What to investigate : Read its published environmental commitments, including equipment lifecycle and heat reuse. Confirm which facilities and services are covered.
2. Datacampus (France)
Infrastructure details to confirm
- PUE / WUE : 1.03 / ~0
- Electricity : Request the electricity procurement method.
- Potential fit : Confirm available infrastructure and service scope.
- What to investigate : Ask about immersion cooling and obtain dated facility measurements. No provider-specific PUE is verified here.
3. Ex2 (France / Canada)
Hosting options to compare
- PUE / WUE : Request measured values and boundaries.
- Electricity : Examine renewable energy and offset claims separately.
- Potential fit : WordPress and bloggers
- What to investigate : Its public catalogue includes website and WordPress hosting. Compare support, backup restoration and environmental evidence for the selected plan.
4. o2switch (France)
Operational requirements to assess
- PUE / WUE : Request dated facility-level data.
- Electricity : Check electricity reporting for the relevant site.
- Potential fit : Freelancers and small businesses
- What to investigate : Review the current plan catalogue, resource limits, backup policies and published environmental approach. Do not assume all resources are unlimited.
5. PlanetHoster (France / Canada)
Infrastructure and availability to assess
- PUE / WUE : Request comparable efficiency data.
- Electricity : Confirm the electricity mix for the selected location.
- Potential fit : E-commerce
- What to investigate : Its catalogue includes shared and dedicated hosting options. Match availability, support and backup requirements to a specific offer.
Hosting and website performance
Environmental positioning and technical performance should be evaluated separately. A green claim does not establish fast application delivery.
Latency and location
Locating hosting near the main audience may reduce network latency, depending on routing and caching.
- Potential benefit : Lower time to first byte (TTFB), to be measured.
- SEO considerations : Server response can contribute to LCP, alongside images, CSS and rendering. Neither hosting choice nor a good LCP guarantees rankings. Read about loading speed and SEO.
Right-sizing resources
Serverless platforms and containers can support flexible resource allocation, but their efficiency depends on configuration and workload. Idle capacity, operational overhead and scaling limits still need assessment.
Some hosting plans include server-side caching such as page or object caching. Check what is actually provided, how it is invalidated and whether it suits the application.
Costs and environmental communication
A hosting decision should account for migration costs, service quality and documented environmental benefits. Any public claim must match the available evidence. For broader budgeting considerations, see: Why consider a sustainably designed website?.
Planning a hosting migration
A migration needs testing, a rollback plan and coordinated DNS changes. Zero downtime cannot be assumed. A practical sequence is:
- Audit the current setup : Use EcoIndex or Website Carbon as one modelled indicator, alongside resource and performance measurements. Compare our environmental assessment tools.
- Size the service : Avoid unnecessary capacity while retaining justified headroom. Check upgrade paths and resource limits.
- Prepare the data : Inventory and back up the service before removing obsolete assets or database content. Validate restoration.
- Plan the DNS switch : Prepare TTL changes in advance where appropriate, migrate during a suitable window and retain rollback capability until validation is complete.
Conclusion
Choose a provider using technical fit, contractual responsibilities and transparent evidence. Review these decisions over time rather than treating a provider name as proof of a low-impact service.